Decentralised energy, built where it is used.

ENA designs and manufactures the layer that makes power local: solar panels and building-integrated PV, lithium storage, hybrid inverters and portable power stations — with ENA Control reporting every kilowatt-hour they move.

An ENA portable outdoor power station on open ground at sunrise, flanked by two banks of ENA solar panels

Why decentralised

Centralised grids are the constraint, not the ambition

Where transmission is thin, the fastest megawatt is the one built at the point of use. ENA's whole range is designed for that case — generation, storage and conversion that stand up on their own and still coordinate when a grid is present.

~85 mNigerians without reliable grid power (World Bank)
>90%of the region's PV, batteries and inverters imported
1 GWof captive demand on ENA's build roadmap

Roadmap figures are ENA's own build targets, not installed capacity.

Global placement

One brand, built for more than one grid

ENA is engineered around a common platform, then certified and specified for the market it ships into — so the same module, pack and inverter family serves a Nigerian mini-grid, a Gulf rooftop and a North American off-grid cabin.

Nigeria · headquarters

Abuja. Design, projects and the local manufacturing programme, serving captive, commercial and residential demand nationwide.

United States

Quincy, Massachusetts. North American supply, portable power distribution and partner engineering.

Qatar & the Gulf

Doha, through ENA Plus. Distributed rooftop solar and storage specified against GSAS and the region's net-billing rules.

ECOWAS

Regional export from Nigerian production, so lead times are measured in weeks rather than shipping seasons.

United Kingdom

Commercial and engineering partnerships supporting the Gulf and African programmes.

Anywhere thin

The range is offline-capable by default. A site with no grid runs the same hardware as a site with a weak one.

An ENA hybrid inverter and storage unit standing in the load space of a vehicle, ready to be carried to site

Manufactured locally

Weeks to site, not shipping seasons

More than nine in ten of the region's panels, batteries and inverters are imported, which puts months of lead time and a currency exposure between a project and its first kilowatt-hour. ENA's manufacturing programme moves module lamination, pack assembly and inverter build onshore — targeting a one-to-two-week build-to-site for standard configurations.

Sustainability

Displacement is the measurement

A solar-plus-storage system's real output is not the kilowatt-hours it makes but the diesel and petrol hours it removes, the peak it shaves and the emissions that never happen. ENA Control records all three per asset and exports them in the formats ESG and GSAS reporting actually ask for.

How it is measured →
Per assetgeneration, displacement and avoided emissions
GSAS / ESGexportable reporting from ENA Control
Second lifepacks triaged and re-graded into stationary duty

Impact to society

A grid connection is a clinic, a classroom and a cold chain

Decentralised power is not only an energy product. The same system that keeps a small factory running keeps vaccines cold, a school lit after dark and a base station on air. ENA's manufacturing roadmap targets 500 or more direct jobs and over 3,000 indirect, in the market that buys the hardware.

Read the impact case

Latest product updates

All products →